From April 1, 2019, as a renewable energy fixed price purchase process (FIT) will be required to install equipment signs at least 20kW.
Measures over 9.8 inches (25 cm) tall x 13.8 inches (35 cm) wide.
The installation date must be posted immediately after the production work (equipment installation work without construction), until March 31, H30.
Low pressure equipment below 50 kW is not prescribed by the Electrical Business Act, but we have included the guidelines to help you easily enter and enter your building facilities.