Feature

●New rubber replacement bow, rubber grip and part of a set of.


Description

[mounted rubber replacement bow, the law] 1. Set Includes Package Includes: Double Tubes, ept-170 m (heat shrink tubing). We also have duct tape, tweezers, a little hot water is required.
2. Tube Insert – 1 Insert the first into the round hole in the end of the rubber tube, stem at the top of approx. 4 cm. Convenient to use and tweezers.
3. Stretch tube Insert the tube expand to take hold with extension, round holes with the gaps.
4. Tube Insert – 2 Expand Your the other end round hole that a tweezer to insert. To Twist And In Just as easily.
5. The end alignment Insert the ends of rubber tubing to get about 4 cm from axle alignment.
6. Fixed with duct tape 1 Groove in this gum paste the tape is approximately/12 cm.
7. Tube to the grooves of the Stretching out of rubber tubing from the round hole and groove inset reach and without having to hold onto your phone.
8. Fixed with duct tape Stretch the rubber tubing in the duct tape in place. The tube is returned as not to pay attention to when ordering.
9. ept-170 m tube 1 Powered by the included ept-170 m tubes, round, punch the hole in the rubber tube to the port.
10. ept-170 m tube 2 ept-170 m tubes are heated to the contracts. Boiling water to pour the ept-170 m tubes and. flabby. ept-170 m punch holes and rubber tubing is not to place before pasting.