Installation Instructions:
Remove dirt, dust, moss, mold, oil, rust from repair areas, with a wire brush, scraper, mild detergent, paint thinner liquid, and dry thoroughly.
Hold the container well with your hands to make the contents uniform.
Rotate the nozzle counterclockwise to remove and trim the tip of the nozzle to fit the repair area. After removing the inner lid, install the nozzle.
Press the nozzle tip to the repair area, and move it with your hand while pushing out the contents and refill. (If you apply the masking tape on both sides of the repair area beforehand it will prevent protruding and give you a clean finish. )
Smooth the surface of the repair area with a spatula. After curing, apply sandpaper (#180-#280) to make the surface more smooth.
When painting the repair area, it will take more than 2 days before painting.
[Precautions]
Depending on the substrate used, it may be difficult to adhere to. Please test on an inconspicuous area before using.
Please do not use when it is below 12°F (5°C) until hardening is completed, or when rainfall is expected within 30 hours.
Please make sure the ground is dry well before using. In addition, please keep water out of 30 hours after installation.
Curing time and installation volume may vary slightly depending on weather conditions and construction conditions.
Depending on the depth and width of the filling, the filling area may crack, and may be damaged by eyes. In that case, please refill it again.